We’ve already talked about construction stages 0, 1 and 2, stages 3 and 4 and stages 5 and 6 in our blog. If you’ve gotten through stage 6, wood floors have been nailed down and interior details like cabinets, doors, trim and stairs have been installed. Now let’s look at stages 7 and 8.
Stage 7
Stage 8